Bodmacity

Family life in South East London

Garden

The garden work is going well. Paul has been working hard for two weeks now and has come a long way. We live on a hill and the garden slopes down and to the left. On the left hand side there was a crumbling wall and a decrepit path. We got a quote from Paul to level the garden as much as possible. He has done a stunning job. With the help of his orange digger he has pushed about 2 feet of soil from across the garden and towards the bottom. The crumbling wall has gone and the result is a much wider garden.

To shore up the extra soil he is in the process of laying long railway-type sleepers to act as retainers. Towards the end of the garden the sleepers will come into the centre and a couple of steps will be built. The main garden will then be turfed as far as the steps. The bit at the back will be left semi 'wild' as I plan to have a small veggie patch down there.

Our new shed is arriving tomorrow so I have taken the day off to help shift it to the bottom of the garden. It's all very exciting!!

All of 2008

Written by Jonathan Wollny, 2005 to 2020.

RSS feed